IGT181 Raised

Please be advised that ES Pipelines Limited has today raised the following IGT UNC Modification:

Summary of Modification

This Modification seeks to align the IGT UNC with the changes implemented into the Uniform Network Code (UNC) under UNC0854 ‘Revision of Virtual Last Resort User and Contingent Procurement of Supplier Demand Event Triggers’ in May 2024. This will ensure that the UNC processes can apply to IGT Supply Meter Points (SMPs) as intended under UNC0854.

Next Steps

The Panel will consider this Modification at its meeting on 27th February 2026.

Further Information

Further information, including the Proposal Form, can be found on the IGT181 page of the IGT UNC website.

If any parties have any questions about this Modification, please do not hesitate to reach out to the Code Administrator.

IGT180 Raised

Please be advised that BUUK has today raised the following IGT UNC Modification:

Summary of Modification

The Gas Shipper Obligation (GSO) is intended to be the long-term funding mechanism for initial hydrogen production projects funded through the Hydrogen Production Business Model (HPBM).

The GSO charge will be placed on Shippers based on the quantity of gas they ship to customers.  The GSO scheme will be administered by the GSO Administrator (who is expected to be the Low Carbon Contracts Company (LCCC), subject to formal appointment through regulations) and will be outside of the IGT UNC (as well as the UNC).  This Modification will create obligations on the Central Data Service Provider (CDSP) to provide services to the GSO Administrator to support the implementation of the GSO scheme, including a period of live data testing.  It is proposed that a subsequent Modification to this one is developed and implemented to ensure the CDSP Obligations endure following implementation of the GSO legislation.

 Next Steps

The Panel will consider this Modification at its meeting on 23rd January 2026.

Please be advised that this Modification is being progressed jointly with related UNC Modification 0922 – CDSP Obligations required for the introduction of the Gas Shipper Obligation. The Joint Office will be administering the joint IGT UNC and UNC Workgroup meetings. The first three meetings have been scheduled as follows:

Thursday 12th February 2026: from 9.30am to 11.30am

Thursday 12th February 2026: from 9.30am to 11.30am

Thursday 23rd February 2026: from 9.30am to 11.30am

Any IGT UNC Parties wishing to attend these meetings can provide attendee names and email addresses to the IGT UNC Code Administrator (IGTUNC@talan.com), who will pass the details onto the Joint Office. Alternatively, parties can also contact the Joint Office directly (enquiries@gasgovernance.co.uk) to provide this information.

Further Information

Further information, including the Proposal Form, can be found on the IGT180 page of the IGT UNC website.

If any parties have any questions about this Modification or the joint Workgroup meetings, please do not hesitate to reach out to the Code Administrator.

CSL01 Raised

Please be advised that CSL (CNG Services Limited) have today raised the following Independent Network Code (INC) Modification:

 Summary of Modification

The IGT UNC rules do not work well for networks with no connection to the GB gas grid. CSL have raised this proposal to update their INC to exclude them from the IGT UNC.

Next Steps

The Panel will consider this Modification at its meeting on 23rd January 2026.

Further Information

Further information, including the Proposal Form, can be found on the CSL01 page of the IGT UNC website.

If any parties have any questions about this Modification, please do not hesitate to reach out to the Code Administrator.

RG008 Raised

Please be advised that BUUK have raised a new IGT UNC Review Proposal:

Purpose of Review

This Review looks to commence IGT UNC preparatory activity ahead of the Code Manager appointment and the subsequent Code Consolidation work that will be undertaken as part of Code Reform and the introduction of the Unified Gas Network Code (UGNC).

Next Steps

The Panel will consider the Review Proposal Request at its meeting on 28th November 2025.

Further Information

Further information, including the Review Proposal Request Form, can be found on the RG008 page of the IGT UNC website.

If any parties have any questions about this Review, please do not hesitate to reach out to the Code Administrator.

IGT179 Raised

Please be advised that BUUK have raised a new IGT UNC Modification today:

Summary of Modification

This Modification looks to provide an update to the NExA tables, and some of the language used around the AQ Review process to provide greater clarity. This will be achieved by adding relevant dates to the NExA tables to provide time periods for which they are relevant, with further clarity added for when the document is ‘live’ or ‘proposed’.

Further Information

Further information, including the Proposal Form, can be found on the IGT179 page of the IGT UNC website.

If any parties have any questions about this Modification, please do not hesitate to reach out to the Code Administrator.

 

IGT178 Raised

Please be advised that BUUK have raised a new IGT UNC Modification today (24th July 2025):

Summary of Modification

This Modification seeks to align the IGT UNC with the UNC following the implementation of UNC0884: Extending the PC4 Read Submission Window. The reference within the IGT UNC to the number of Supply Point Systems Business Days (SPSBD) after the read date to submit a read for settlement needs to be updated to remain aligned.

Further Information

Further information, including the Proposal Form and Draft Legal Text, can be found on the IGT178 page of the IGT UNC website.

If any parties have any questions about this Modification, please do not hesitate to reach out to the Code Administrator.

IGT177 Raised

Please be advised that BUUK have raised a new IGT UNC Modification today (21st May 2025):

Summary of Modification

This Modification seeks to maintain existing obligation on IGTs to obtain a meter reading (commonly called the “must read” obligation) following non-provision of a Valid Meter Reading by a Shipper, by removing reference to UNC TPD M 5.10 from IGT UNC Part E – Meter Reading, 11 (Failure to obtain readings), and aligning the total relevant text within the IGT UNC.

Further Information

Further information, including the Proposal Form and draft legal text changes can be found on the IGT177 page of the IGT UNC website.

If any parties have any questions about this Modification, please do not hesitate to reach out to the Code Administrator.

 

IGT176 Raised

Please be advised that CNG Services Ltd have raised a new IGT UNC Modification today (19th March 2025):

Summary of Modification

This Modification identifies the requirement for and aims to make changes to IGT UNC to enable UNC0887 ‘Facilitating Bi-Directional Connections Between IGT Pipelines and the National Transmission System (NTS)’ ‘to be implemented by including its operator, National Gas Transmission (NGT) as a ‘Large Transporter’ and to apply the core IGT concept of ‘deeming flow’ to and from the National Balancing Point (NBP), whilst replicating as closely as practicable the existing NTS ‘direct connect’ exit and entry arrangements that UNC Shippers use.

Further Information

Further information, including the Proposal Form, can be found on the IGT176 page of the IGT UNC website.

If any parties have any questions about this Modification, please do not hesitate to reach out to the Code Administrator.

11th August 2022

IGT UNC Modification Workstream meeting 22-08 (Thursday 11th August 2022).

Document Description Document Type Author Publication Date
22-08 Final Minutes Adobe PDF Code Administrator 09/09/2022
22-08 Draft Minutes Adobe PDF Code Administrator 18/08/2022
22-08 GES Release PowerPoint Xoserve 15/08/2022
22-08 Final Agenda Adobe PDF Code Administrator  04/08/2022
22-08 IGT159 – Rough Order of Magnitude (ROM) Request and Response Adobe PDF Xoserve 05/08/2022
22-08 IGT159 – Draft Legal Text V0.4  Adobe PDF Code Administrator 04/08/2022
22-08 Cross-Code Modification Implications Tracker Microsoft Excel Code Administrator 04/08/2022
22-08 Known Issue Register Microsoft Excel Code Administrator 04/08/2022
22-08 Draft Agenda Adobe PDF Code Administrator 28/07/2022

26th November 2021

IGT UNC Modification Panel meeting 21-11 (Friday 26th November 2021).

Document Description Document Type Author Publication date
21-11 Final Minutes (Reconvened Meeting) Adobe PDF Code Administrator 28/01/2022
21-11 Final Minutes Adobe PDF Code Administrator 28/01/2022
21-11 Draft Minutes (Reconvened Meeting) Adobe PDF Code Administrator 03/12/2021
21-11 Draft Minutes Adobe PDF Code Administrator 03/12/2021
21-11 Determinations Adobe PDF Code Administrator 26/11/2021
21-11 Final Agenda Adobe PDF Code Administrator 19/11/2021
21-11 Workgroup Summary Adobe PDF Code Administrator  19/11/2021
21-11 Draft Agenda Adobe PDF Code Administrator 12/11/2021