CSL01 – Exclusion of Standalone Networks from IGT UNC

Current Status: Authority Determination

The Final Modification Report was issued to the Authority on 1st June 2026.

 

Summary of Modification

This Modification has been raised by CNG Services Limited (CSL). The IGT UNC rules are do not work well for networks with no connection to the GB gas grid, and this proposal excludes them from the IGT UNC.

 

Progression Timetable

Initial Panel consideration 23/01/2026
Initial consideration by Workgroup 12/02/2026
Workgroup Report presented to Panel 24/04/2026
Draft Modification Report issued for consultation 27/04/2026
Consultation close-out date 19/05/2026
Final Modification Report available for Panel 21/05/2026
Modification Panel Decision 29/05/2026
Modification issued to Authority 01/06/2026

 

 Documentation

Document Description Document Type Author Date
CSL01 Final Modification Report v1.0 Adobe PDF Code Administrator 01/06/2026
CSL01 Final Modification Report v0.1 Adobe PDF Code Administrator 21/05/2026
CSL01 NESO Consultation Response Adobe PDF NESO 19/05/2026
CSL01 CSL Consultation Response Adobe PDF CSL 18/05/2026
CSL01 BUUK Consultation Response Adobe PDF BUUK 28/04/2026
CSL01 Draft Modification Report v1.0 Adobe PDF Code Administrator 27/04/2926
CSL01 Draft Modification Report v0.2 Adobe PDF Code Administrator 15/04/2026
CSL01 Workgroup Report v2.0 Adobe PDF Code Administrator 15/04/2026
CSL01 Workgroup Report v1.1 Adobe PDF Code Administrator 31/03/2026
CSL01 Draft Modification Report v0.1 Adobe PDF Code Administrator 20/03/2026
CSL01 Workgroup Report v1.0 Adobe PDF Code Administrator 20/03/2026
CSLo1 Draft Workgroup Report v0.1 Adobe PDF Code Administrator 05/03/2026
CSL01 Modification Proposal Form v1.0 Adobe PDF CSL 15/01/2026