Please be advised that CNG Services Ltd have raised a new IGT UNC Modification today (19th March 2025):
Summary of Modification
This Modification identifies the requirement for and aims to make changes to IGT UNC to enable UNC0887 ‘Facilitating Bi-Directional Connections Between IGT Pipelines and the National Transmission System (NTS)’ ‘to be implemented by including its operator, National Gas Transmission (NGT) as a ‘Large Transporter’ and to apply the core IGT concept of ‘deeming flow’ to and from the National Balancing Point (NBP), whilst replicating as closely as practicable the existing NTS ‘direct connect’ exit and entry arrangements that UNC Shippers use.
Further Information
Further information, including the Proposal Form, can be found on the IGT176 page of the IGT UNC website.
If any parties have any questions about this Modification, please do not hesitate to reach out to the Code Administrator.