IGT170 – Resolution of Missing Messages following Central Switching Service implementation and integration with REC Change R0067

  • Modification raised by SEFE on 25th September 2023.
  • On 29th September 2023 the IGT UNC Panel agreed to send Modification to the October 2023 IGT UNC Workstream. 
  • On 27th October 2023 the IGT UNC Panel agreed to send this Modification out for a three-week consultation.
  • The Panel recommended on 24/11/2023 that IGT166 be implemented under Self-Governance, as part of an extraordinary release.
  • IGT170 was implemented 18/12/23 as part of an extraordinary release.
Document Description Document Type Author Date
IGT170 Notice of Implementation Adobe PDF Code Administrator 27/11/2023
IGT170 Final Legal Text (V1.0) Adobe PDF Code Administrator 24/11/2023
IGT170 Final Modification Report (V1.0, Post-Panel) Adobe PDF Code Administrator 24/11/2023
IGT170 Final Modification Report (V1.0, Pre-Panel) Adobe PDF Code Administrator 21/11/2023
IGT170 MUA Gas Limited Consultation Response Adobe PDF MUA Gas Limited 21/11/2023
IGT170 BUUK Consultation Response Adobe PDF BUUK 21/11/2023
IGT170 Indigo Pipelines Consultation Response Adobe PDF Indigo Pipelines Limited 21/11/2023
IGT170 Consultation Template Microsoft Word Code Administrator 30/10/2023
IGT170 Draft Modification Report (v1.0) Adobe PDF Code Administrator 30/10/2023
IGT170 Draft Legal Text (v2.0) Adobe PDF Code Administrator 20/10/2023
IGT170 Workgroup Report Adobe PDF Code Administrator 13/10/2023
IGT170 Draft Legal Text (v1.0) Adobe PDF Code Administrator 06/10/2023
IGT170 Amended Modification Proposal (v2.0) Adobe PDF SEFE 05/10/2023
IGT170 Draft Modification Proposal (v1.0) Adobe PDF SEFE 25/09/2023