IGT082 – IGT Single Service Provision, noneffective Days for cutover in 2016

Modification raised by Brookfield Utilities 7th October 2015
Modification Proposal considered by Panel 21st October 2015

The Modification Panel sent IGT082 to Workgroup for further development.

Workgroup #1 3rd November 2015
Workgroup #2 1st December 2015

The Workgroup Report was published on 9th December 2015 ahead of consideration at the Panel on 16th December 2015.

The Panel on 16th December determined that the Modification should be circulated as a Draft Modification Report.

The DMR was circulated for consultation on 17th December 2015.

Responses to the consultation was considered by the Panel on 20th January 2016. The Panel recommended implementation. The Final Mod Report was sent to Ofgem on 22nd January 2016.

Ofgem determined to NOT IMPLEMENT this Modification, with the Authority Decision received on 30th June 2016.

Document Title Description Type Pub Date Author
IGT082 Authority Decision Adobe PDF 01/07/2016  
IGT082 Final Modification Report to Ofgem Adobe PDF 22/01/2016  
IGT082 Notice of Non-Implementation Adobe PDF 01/07/2016  
IGT082 Final Modification Report Adobe PDF 14/01/2016  
Brookfield Utilities DMR Consultation Response Adobe PDF 14/01/2016  
EON UK DMR Consultation Response Adobe PDF 14/01/2016  
Indigo Pipelines DMR Response Adobe PDF 14/01/2016  
npower DMR Response Adobe PDF 14/01/2016  
SSE Supply DMR Response Adobe PDF 14/01/2016  
IGT082 Draft Modification Report Adobe PDF 17/12/2015  
IGT082 IGT082 Workgroup Report Adobe PDF 09/12/2015  
IGT082 Single Service Provision Supporting Report Adobe PDF 27/11/2015  
IGT082 Rationale for NEDs Adobe PDF 27/11/2015  
IGT082 Revised Modification Proposal (v2.2) Adobe PDF 20/11/2015  
IGT082 Terms of Reference Word Document (Office 97-2003) 03/11/2015  
IGT082 Change of Supplier and SPR update timeline for October 2016 implementation dates Adobe PDF 12/10/2015