- Modification Proposal raised by BUUK on 11 October 2019
- Being developed alongside IGT132 via the Modification Workstream
- The Modification will go out for a 25-day Consultation window, closing on 27th January 2021.
Document Title | Description | Type | Pub Date | Author |
QPL042 | Final Modification Report (Pre Panel) | Adobe PDF | 18/02/2021 | Code Administrator |
QPL042 | Draft Modification Report | Adobe PDF | 18/12/2020 | Code Administrator |
QPL042 | Workgroup Report | Adobe PDF | 12/11/2020 | Code Administrator |
QPL042 | Draft Individual Network Code v6.0 | Adobe PDF | 06/11/2020 | Code Administrator |
QPL042 | Modification Proposal | Adobe PDF | 11/09/2019 | BUUK |