QPL042 – Removal of Code Credit Rules from QPL Network Code

  • Modification Proposal raised by BUUK on 11 October 2019
  • Being developed alongside IGT132 via the Modification Workstream
  • The Modification will go out for a 25-day Consultation window, closing on 27th January 2021.
  • The Panel considered v1.0 of the Final Modification Report in February 2021 and determined that the Modification should be paused until there was a decision on related Modification IGT132.
  • The Panel considered the updated Final Modification report in February 2023 following the approval of IGT132VV. The Panel unanimously approved the Modification.
Document Title Description Type Pub Date Author
QPL042 Notice of Implementation Adobe PDF 27/02/2023 Code Administrator
QPL042 Final Modification Report (Post Panel, v2.0) Adobe PDF 27/02/2023 Code Administrator
QPL042 Final Modification Report (Pre Panel, v1.1) Adobe PDF 15/02/2023 Code Administrator
QPL042 Final Modification Report (Pre Panel, v1.0) Adobe PDF 18/02/2021 Code Administrator
QPL042 Draft Modification Report Adobe PDF 18/12/2020 Code Administrator
QPL042 Workgroup Report Adobe PDF 12/11/2020 Code Administrator
QPL042 Draft Individual Network Code v6.0 Adobe PDF 06/11/2020 Code Administrator
QPL042 Modification Proposal Adobe PDF 11/09/2019  BUUK