IGT172 – Provision for gas entry within the IGT UNC

  • Modification raised by Barrow Shipping on 20th October 2023
  • On 27th October 2023 the IGT UNC Panel agreed to send this Modification to the November 2023 IGT UNC Workstream.
Document Description Document Type Author Date
IGT172 Consultation Template Microsoft Word Code Administrator 22/03/2024
IGT172 Draft Modification Report v1.0 Adobe PDF Code Administrator 22/03/2024
IGT172 Draft Legal Text v1.0 Adobe PDF Code Administrator 22/03/2024
IGT172 Workgroup Report Adobe PDF Code Administrator 15/03/2024
IGT172 IGT UNC (V13.15) – Mark up (23 January 2024) Adobe PDF Barrow Shipping 29/01/2024
IGT172 Draft Working Legal Text -Tracked Changes to the IGT UNC in TPD Section I v2.0 Adobe PDF Barrow Shipping 23/01/2024
IGT172 Draft Legal Text – Explanatory Table v2.0 Adobe PDF Barrow Shipping 23/01/2024
IGT172 Amended Modification Proposal (v4.0, Clean) Adobe PDF Barrow Shipping 27/12/2023
IGT172 Amended Modification Proposal (v4.0, Tracked) Adobe PDF Barrow Shipping 27/12/2023
IGT172 IGT172 – Central Impacts Adobe PDF Xoserve 22/12/2023
IGT172 Draft Working Legal Text -Tracked Changes to the IGT UNC in TPD Section I v1.0
Adobe PDF Barrow Shipping 22/12/2023
IGT172 Draft Legal Text – Explanatory Table v1.0 Adobe PDF Barrow Shipping 22/12/2023
IGT172 Amended Modification Proposal (v3.0, Clean) Adobe PDF Barrow Shipping 30/11/2023
IGT172 Amended Modification Proposal (v3.0, Tracked) Adobe PDF Barrow Shipping 30/11/2023
IGT172 Amended Modification Proposal (v2.0, Clean) Adobe PDF Barrow Shipping 06/11/2023
IGT172 Amended Modification Proposal (v2.0, Tracked) Adobe PDF Barrow Shipping 06/11/2023
IGT172 Draft Modification Proposal Adobe PDF Barrow Shipping 20/10/2023