IGT169 – Aligning the Capacity requirements for NExA Supply Points in the UNC with Capacity requirements for LDZ CSEP Ancillary Agreement (LCAA) Supply Points under the IGT UNC (i.e. bringing Code in line with UNC0701 and UNC0853)

  • Modification raised by MUA on 23rd August 2023.
  • The IGT UNC Panel agreed on 29th September 2023 to send this Modification for a three-week consultation.
  • The Panel agreed to send this Modification to the Authority for decision on 27th October 2023.
  • The Authority approved IGT169 for implementation on 27th March 2024.  Implementation date TBC.
  • IGT169 was implemented on Monday, 29th April 2024 as part of an Extraordinary Release.
Document Description Document Type Author Date
IGT169 Notice of Implementation Adobe PDF Code Administrator 29/04/2024
IGT169 Notice of Implementation Adobe PDF Code Administrator 27/03/2024
IGT169 Authority Decision Adobe PDF Ofgem 27/03/2024
IGT169 Final Legal Drafting Adobe PDF Code Administrator  21/03/2024
IGT169 Final Modification Report (V1.0, Post-Panel) Adobe PDF Code Administrator 30/10/2023
IGT169 Final Modification Report (V1.0, Pre-Panel) Adobe PDF Code Administrator 24/10/2023
IGT169 MUA Gas Limited Consultation Response Adobe PDF MUA Gas Limited 24/10/2023
IGT169 Harlaxton Gas Networks Consultation Response Adobe PDF Harlaxton Gas Networks 24/10/2023
IGT169 BUUK Consultation Response Adobe PDF BUUK 24/10/2023
IGT169 Indigo Pipelines Consultation Response Adobe PDF Indigo Pipelines Limited 24/10/2023
IGT169 Consultation Template Microsoft Word Code Administrator 02/10/2023
IGT169 Draft Modification Report (v1.0) Adobe PDF Code Administrator 02/10/2023
IGT169 Draft Legal Text Commentary (v.1.0) Adobe PDF Code Administrator 22/09/2023
IGT169 Draft Legal Text (v2.0) Adobe PDF Code Administrator 22/09/2023
IGT169 Workgroup Report (v1.0) Adobe PDF Code Administrator 22/09/2023
IGT169 Draft Legal Text (v1.0) Adobe PDF MUA 23/08/2023
IGT169 Draft Modification Proposal Adobe PDF MUA 23/08/2023