IGT167 – Alignment of the IGT UNC with UNC NGT Demand Side Response Arrangements

  • Modification raised by BUUK on 04th July 2023.
  • IGT167 was initially considered at the 28th July Modification Panel, where it was agreed to send the Modification directly to a shortened consultation, closing 11th August 2023.
  • The Panel considered the Final Modification Report at an Extraordinary Panel on 17th August 2023 and agreed to send the Modification to the Authority for decision.
  • The Authority approved IGT167 on 31st August 2023.
  • IGT167 was implemented as part of an Extraordinary Release on 31st August 2023.
Document Description Document Type Author Date
IGT167 Notice of Implementation Adobe PDF Code Administrator 31/08/2023
IGT167 Authority Decision Adobe PDF Ofgem 31/08/2023
IGT167 Final Legal Drafting (v1.0) Adobe PDF Code Administrator 17/08/2023
IGT167 Final Modification Report (vo.1, Post-Panel) Adobe PDF Code Administrator 17/08/2023
IGT167 Final Modification Report (v0.1, Pre-Panel) Adobe PDF Code Administrator 14/08/2023
IGT167 Indigo Consultation Response Adobe PDF Indigo Pipelines 14/08/2023
IGT167 BUUK Consultation Response Adobe PDF BUUK 14/08/2023
IGT167 Consultation Template Word Document Code Administrator 31/07/2023
IGT167 Draft Modification Report (v1.0) Adobe PDF BUUK 28/07/2023
IGT167 Draft Legal Text (v0.2) Adobe PDF BUUK 28/07/2023
IGT167 Draft Legal Text (UNC0822,0833 only) (v0.2) Adobe PDF BUUK 28/07/2023
IGT167 Modification Proposal (v1.0) Adobe PDF BUUK 19/07/2023
IGT167 Draft Legal Text (v0.1) Adobe PDF BUUK 04/07/2023
IGT167 Draft Legal Text (UNC0822,0833 only) (v0.1) Adobe PDF BUUK 04/07/2023
IGT167 Draft Modification Proposal Adobe PDF BUUK 04/07/2023