IGT135 – Alignment of the IGT UNC Part K and the Data Permissions Matrix

  • Modification Proposal raised by Gazprom on 8th November 2019.
  • The Workgroup Report was completed at the Workstream meeting on 13th August 2020.
  • The Workgroup Report will be presented to Panel on 28th August 2020.
  • The Modification was sent out to consultation on 2nd September 2020 for a 15-day consultation.
  • The close out date for the Consultation is 23rd September 2020.
Document Title Description Type Pub Date Author
IGT135 Draft Modification Report Adobe PDF 02/09/2020 Code Administrator
IGT135 Workgroup Report Adobe PDF 13/08/2020 Code Administrator
IGT135 Draft Workgroup Report Adobe PDF 06/08/2020 Code Administrator
IGT135 IGT-UNC-Modification – Alignment of the IGT UNC Part K and the Data Permissions Matrix V.3 (Change Marked) Adobe PDF 06/08/2020 Gazprom
IGT135 Data Permissions Matrix – Conditionality Document – V1.0 Draft for DWG and IGT Workstream Adobe PDF 06/08/2020 Gazprom
IGT135 DPM – Coditionallity Document – V0.1 – CoMC approval Adobe PDF 11/06/2020 Gazprom
IGT135 Modification Proposal v.2 (clean) Adobe PDF 04/06/2020 Gazprom
IGT135 Modification Proposal v.2 ( Change Marked) Adobe PDF 04/06/2020 Gazprom
IGT135 Modification Proposal v.1(Clean) Adobe PDF 13/05/2020 Gazprom
IGT135 Modification v.1 (Change Marked Adobe PDF 13/05/2020 Gazprom
IGT135 Modification Proposal Adobe PDF 08/11/2019 Gazprom