IGT135 – Alignment of the IGT UNC Part K and the Data Permissions Matrix

  • Modification Proposal raised by Gazprom on 8th November 2019.
  • The Workgroup Report was completed at the Workstream meeting on 13th August 2020.
  • The Workgroup Report will be presented to Panel on 28th August 2020.
  • The Modification was sent out to consultation on 2nd September 2020 for a 15-day consultation.
  • The close out date for the Consultation is 23rd September 2020.
  • Final Modification Report discussed by Panel on 23rd October 2020.
  • Panel determined this Self-Governance Modificaiton should be implemented subject to the 15-day appeal window.
  • The Modification is due to be included in an extraordinary release on 18th November 2020 to be implemented alongside UNC697VS.
Document Title Description Type Pub Date Author
IGT135 Notice of Implementation Adobe PDF 28/10/2020 Code Administrator
IGT135 Final Modification Report (post-panel) Adobe PDF 28/10/2020 Code Administrator
IGT135 Final Modification Report (pre-panel) Adobe PDF 07/10/2020 Code Administrator
IGT135 Consultation Responses Zip file 07/10/2020
IGT135 Draft Modification Report Adobe PDF 02/09/2020 Code Administrator
IGT135 Workgroup Report Adobe PDF 13/08/2020 Code Administrator
IGT135 Draft Workgroup Report Adobe PDF 06/08/2020 Code Administrator
IGT135 IGT-UNC-Modification – Alignment of the IGT UNC Part K and the Data Permissions Matrix V.3 (Change Marked) Adobe PDF 06/08/2020 Gazprom
IGT135 Data Permissions Matrix – Conditionality Document – V1.0 Draft for DWG and IGT Workstream Adobe PDF 06/08/2020 Gazprom
IGT135 DPM – Coditionallity Document – V0.1 – CoMC approval Adobe PDF 11/06/2020 Gazprom
IGT135 Modification Proposal v.2 (clean) Adobe PDF 04/06/2020 Gazprom
IGT135 Modification Proposal v.2 ( Change Marked) Adobe PDF 04/06/2020 Gazprom
IGT135 Modification Proposal v.1(Clean) Adobe PDF 13/05/2020 Gazprom
IGT135 Modification v.1 (Change Marked Adobe PDF 13/05/2020 Gazprom
IGT135 Modification Proposal Adobe PDF 08/11/2019 Gazprom