IGT132VV – Introduction of IGT Code Credit Rules

  • Modification Proposal raised by BUUK on 11th October 2019
  • The Modification will go out for a 25-day Consultation window, closing on 27th January 2021.
  • The Modification was sent back to the Workgroup to discuss new issues raised during the Consultation. The Modification will be discussed at the March Workstream meeting.
  • A Variation request was granted by the IGT Panel on 26th March 2021.
  • The Panel agreed to send IGT132V out for further consultation for a condensed period of 10 working days. This will close out on 20th April 2021.
  • The Panel accepted the Variant request on IGT132V via a unanimous vote, based on a change to the Modification following a second Consultation as per Part L16 of the IGT UNC at the April 2021 meeting.
  • At the April 2021 Panel meeting, the Panel recommended by majority vote that IGT132VV should be implemented.
  • The Final Modification Report was submitted to Ofgem for Authority decision on 29th April 2021.
  • On 2nd July Ofgem took the decision to send back the Final Modification Report directing that the report is revised and resubmitted, to address the issues set out.
Document Title Description Type Pub Date Author
IGT132VV Ofgem Direction Letter Adobe PDF 02/07/2021 Ofgem
IGT132VV Final Modification Report (Post-Panel) Adobe PDF 23/04/2021  Code Administrator
IGT132VV Varied Modification Adobe PDF 23/04/2021 BUUK
 

IGT132V

Final Modification Report (Pre-Panel) Adobe PDF 16/04/2021 Code Administrator
IGT132V Consultation Response – EAP Adobe PDF 16/04/2021 Code Administrator
IGT132V Consultation Response – Indigo Adobe PDF 16/04/2021 Code Administrator
IGT132V Consultation Response – BUUK Adobe PDF 16/04/2021 Code Administrator
IGT132V Consultation Response – E.ON Adobe PDF 16/04/2021 Code Administrator
IGT132V IGT132V consultation template Adobe PDF 26/03/2021 Code Administrator
IGT132V Draft Modification Report (IGT132V) Adobe PDF 26/03/2021 Code Administrator
IGT132V Varied Modification Adobe PDF 26/03/2021 Code Administrator
IGT132 Workgroup Report v4 Adobe PDF 16/03/2021 Code Administrator
IGT132 Final Modification Report (Pre Panel) Adobe PDF 18/02/2021 Code Administrator
IGT132 Consultation Response – E.ON Adobe PDF 28/01/2021 E.ON
IGT132 Consultation Response – ESPUG Adobe PDF 28/01/2021 ESPUG
IGT132 Consultation Response – EA Adobe PDF 28/01/2021 Energy Assets
IGT132 Consultation Response – BUUK Adobe PDF 28/01/2021 BUUK
IGT132 Consultation Response – Indigo Pipelines Adobe PDF 28/01/2021 Indigo Pipelines
IGT132 Draft Modification Report Adobe PDF 18/12/2020 Code Administrator
IGT132 Workgroup Report v3 Adobe PDF 10/12/2020 Code Administrator
IGT132 Draft Workgroup Report v2 Adobe PDF 03/12/2020 Code Administrator
IGT132 Workgroup Report Adobe PDF 12/11/2020 Code Administrator
IGT132 Modification Proposal Version 6 (Change Marked) Adobe PDF 30/10/2020 BUUK
IGT132 Modification Proposal Version 5 (Clean) Adobe PDF 23/09/2020 BUUK
IGT132 Modification Proposal Version 5 (Changed Marked) Adobe PDF 23/09/2020 BUUK
IGT132 Modification Proposal Version 4 (Change Marked) Adobe PDF 05/03/2020 BUUK
IGT132 Modification Proposal Version 4 Adobe PDF 05/03/2020 BUUK
IGT132 Modification Proposal Version 3 (Change Marked) Adobe PDF 13/01/2020 BUUK
IGT132 Modification Proposal Version 3 Adobe PDF 13/01/2020 BUUK
IGT132 Modification Proposal Version 2 (Change Marked) Adobe PDF 02/01/2020 BUUK
IGT132 Modification Proposal Version 2 Adobe PDF 02/o1/2020 BUUK
IGT132 Modification Proposal Adobe PDF 11/10/2019 BUUK