IGT049 – Tolerance for SSP Sites

The Modification was raised by npower on the 27th September 2012.

The Draft Final Modification Report for this Modification was release for consultation on 16th January 2013 and was considered at the February 2013 Modification Panel Meeting.

The Final Modification Report can be seen below as well as Ofgem’s decision. An implementation date has been set for the 1st November 2013.

Document Title Description Type Pub Date Author
IGT049 Final Modification Report Adobe PDF 22/02/2013  
IGT049 Authority Decision Adobe PDF 03/04/2013  
IGT049 Draft Final Modification report Adobe PDF 16/01/2013  
Npower DMR Consultation Response Adobe PDF 21/12/2012  
IPL DMR Consultation Response Adobe PDF 21/12/2012  
IGT049 Amended Ancillary Document Adobe PDF 30/11/2012  
IGT049 Draft Modification Report Adobe PDF 30/11/2012  
Npower Consultation Response Adobe PDF 12/11/2012  
Scottish Power Consultation Response Adobe PDF 12/11/2012  
ESP Consultation Response Adobe PDF 12/11/2012  
SSE Pipelines Consultation Response Adobe PDF 12/11/2012  
E.On Consultation Response Adobe PDF 09/11/2012  
British Gas Consultation Response Adobe PDF 09/11/2012  
GTC Pipelines Ltd Consultation Response Adobe PDF 29/10/2012  
Fulcrum Pipelines Consultation Response Adobe PDF 22/10/2012  
IGT049 Modification Proposal Adobe PDF 28/09/2012